Calendar Month View

Share & Bookmark, Press Enter to show all options, press Tab go to next option
Print

Hydrant Flushing Begins

  • Date: 04/19/2021 7:00 AM - 3:00 PM  
  • Location: Village of Sussex
  • Introduction: Hydrant flushing is scheduled for April 19-23 and 26-30.

Hydrant flushing is scheduled for April 19-23 and 26-30. Flushing removes natural minerals that have settled in the pipes to maintain water clarity and quality in the distribution pipes. It also allows staff to verify the proper operation of hydrants and valves to maintain firefighting capabilities.

Flushing may lead to temporary discoloration of your water. If this happens, open the cold water tap nearest to your water meter--usually the basement sink or outside hose bib--until the water runs clear. This usually takes about 10-15 minutes.

Return to full list >>